Sarasota County
Casey
Key Shoreline Reventment,1,500 LF +/-, Nokomis, Florida. MSB Surveying, Inc. is
currently providing the boundary, coastal construction control line, gulf
setback line, topography needed to obtain permitting through Sarasota County
Environmental Resource and Florida Department of Environmental Protection for
the purpose of constructing a Geotextile container for shoreline stabilization.
This information will be gathered using Real Time Kinematic GPS and conventional
surveying methods using data collectors. |
Manasota Key Shoreline Reventment, 2,200 LF +/-, Manasota Key,
Florida. MSB Surveying, Inc. provided the boundary, mean high water and
topographic survey, coastal construction control line, gulf setback line needed
to obtain permitting through Sarasota County Environmental Resource and Florida
Department of Environmental Protection for the purpose of constructing a seawall
for shoreline stabilization. This information will be gathered using Real Time
Kinematic GPS and conventional surveying methods using data collectors.
|
Matheny
Creek, Sarasota, Florida. MSBSurveying, Inc. has provided the hydrographic
information needed for the purpose of permitting a dredge for the navigatable
access to the center of the channel, depicted contoured depths of water relative
to mean low water, location of existing shoreline structures, top of wall/dock
spot elevations at each of the fourteen subject parcels, benchmarks for dredge
contractor and approximate side lot lines. We will be obtaining the post dredge
depths once the dredging has been completed. This information was and will be
gathered using Real Time Kinematic GPS and conventional surveying methods using
data collectors. |
Fiddler
Bayou, Sarasota, Florida. MSB Surveying, Inc. provided the topographic,
hydrographic information, established mean high water using conventional
surveying methods with data collectors, also the historical research of
shoreline changes of Sarasota Big Pass and established boundaries back to the
1850’s. This information was needed to obtain permitting through Sarasota County
Environmental Resource and Florida Department of Environmental Protection. |
Condo
by the Bay Towers I & II, Sarasota, Florida – Mean High Water Survey, riparian
lines, establish historic filling of bay, establish boundary of TIFF deed of
submerged lands before for filling, established the submerged land leases and
revised submerged lands leases for Piers 1 & 2 for the new design, hydrographic
information, including existing shoreline structures, contour lines defining
depths of water relative to mean low water and location of bethnic resources for
the purpose of dock permitting. This information was used to obtain the permits
necessary through Sarasota County Environmental Resources Department and the
Florida Department of Environmental Protection.
|
Booth Preserve, Sarasota, Florida – MSB Surveying, Inc. provided the mean high
water study on Phillippi Creek from the Intracoastal water way to Bee Ridge Road
and a portion of Red Bug Slough, boundary and Mean high water survey,
topographic survey, subdivision plat. This information was used to obtain the
permits necessary through Sarasota County and the Florida Department of
Environmental Protection. After County approval we continued the project through
asbuilts and stakeout for vertical and horizontal construction.
|
Waters
Edge Condominium Reventment, Siesta Key, Florida. MSB Surveying, Inc. provided
the boundary, mean high water and topographic survey, coastal construction
control line, gulf setback line, topography needed to obtain permitting through
Sarasota County Environmental Resource and Florida Department of Environmental
Protection for the purpose of re-constructing a seawall for shoreline
stabilization. This information will be gathered using Real Time Kinematic GPS
and conventional surveying methods using data collectors. |
Twitchell’s
Subdivision, Siesta Key, Florida - MSB Surveying, Inc. provided the boundary and
mean high water survey giving an opinion of the remainder parcels of land titled
to the Association after the unrecorded plat of boulevard Beach Club. We were
used as an expert witness giving an opinion of determining boundary and
interpolation of descriptions. This information was needed for court and lead to
a settlement.
|
City of Sarasota
Bay
Island Park, City of Sarasota, Florida. MSB Surveying, Inc. is providing the
topographic and hydrographic information needed to replace approximately 100 LF
of seawall and obtain permitting through Sarasota County Building Department.
This information will be gathered using Real Time Kinematic GPS and conventional
surveying methods using data collectors. |
Town of Longboat Key
Lighthouse
Point, Sarasota, Florida. MSB Surveying, Inc. provided the boundary, mean high
water, topographic and hydrographic surveys and monitored shoreline changes of
the east end of point along New Pass. The soundings were obtained using an Odom
Precision Survey Echo Sounder, Model HT100 and applying tidal reductions from
observed water levels during the survey. Horizontal positioning of soundings
were obtained using a Trimble Differential GPS System, Model: DSM1212H.
Information also obtained by conventional surveying methods using data
collectors. This information was needed to obtain permitting through Town of
Longboat Key and the Florida Department of Environmental Protection.
|
Positano,
A Condominium, Longboat Key, Florida. This was the old Holliday Inn. MSB
Surveying, Inc. provided a boundary (erosion control line) and topographic
survey for construction seaward of the Coastal Construction Control Line. This
information was needed to obtain permitting through Town of Longboat Key and the
Florida Department of Environmental Protection. After approval we continued the
project through platting, construction stakeout of all improvements and
asbuilts. |
City of Anna Maria
West
Bay Point & Moorings Condominium Reventment, City of Anna Maria, Florida. MSB
Surveying, Inc. provided the mean high water and topographic survey needed to
obtain permitting through City of Anna Maria and Florida Department of
Environmental Protection for the purpose of re-constructing rip-rap for
shoreline stabilization. This information will be gathered using conventional
surveying methods using data collectors. |
Manatee County
Cypress
Creek Estates, Manatee County, Florida - MSB Surveying, Inc. provided the mean
high water survey, riparian lines and hydrographic survey. This information was
used to obtain the permits necessary through Manatee County Environmental
Resources Department and the Florida Department of Environmental Protection.
After the permit was issued the adjoining parcel protested the permit. The case
went to mediation and was settled out of court agreeing to position the dock
within two different opinions of the riparian lines. |
Charlotte County
Preserve
of Don Pedro, Don Pedro Island, Florida. MSB Surveying, Inc. provided the mean
high water survey, riparian lines, hydrographic survey of a portion of
Gasparilla Sound adjacent to Don Pedro Island, shoreline improvements, contour
depths of water relative to mean low water and submerged land lease for
obtaining a major work permit for a multi-slips dock. This information was used
to obtain permits through Charlotte County Building Department and the Florida
Department of Environmental Protection. |
Peace
River, Port Charlotte, Florida – MSB Surveying, Inc. provided the mean high
water study and survey. This information was used to obtain to establish the
boundary of the upland parcel for due diligence for the design of a marina. This
information will be gathered using automatic water level recorders, Real Time
Kinematic GPS and conventional surveying methods using data collectors. |
|